John Calladine says: 1-Dec-2024 at 8:54 am Log in to Reply John & Sheryl reporting from Barker. Slowest lift on the mountain being the only one open. Alternated loading with every other empty chair to allow loading from Mid-station meant 90 minute waits down below
John & Sheryl reporting from Barker.
Slowest lift on the mountain being the only one open.
Alternated loading with every other empty chair to allow loading from Mid-station meant 90 minute waits down below